Procurement of 0703-2550CIC2S012 Procurement of equipment, supply and installation for the construction of a new water plant & intelligent water management information system engineering Financed by AFD(1)

2025-05-05
Instrimpex International Tendering Co.,Ltd. entrusted by the purchaser, invites sealed bids from eligible suppliers home and abroad for the supply of the following goods and/or service by way of International Competitive Bidding. The tender notice was released on www.qgbr.cn on2025-05-05
1、Bidding Conditions
Overview:The Mianyang City Anzhou Investment Holding Co., Ltd. now invites sealed bids from eligible bidders for the design, supply and installation of AZ-G1: Procurement of equipment, supply and installation for the construction of a new water plant & intelligent water management information system engineering ("the Facilities"). International competitive bidding will conducted in accordance with the Agency's "Single-Stage One envelope" Bidding Procedure.
Source of Funds:The Mianyang City Anzhou Investment Holding Co., Ltd. has received funds from the Agence Fran?aise de Développement (the French Development Agency - AFD) towards the cost of Compound Ecological Project in Hedong New Area, Anzhou District, Mianyang City Financed by AFD. It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for AZ-G1: Procurement of equipment, supply and installation for the construction of a new water plant & intelligent water management information system engineering.
Description of The Prepared Bidding Conditions:The Mianyang City Anzhou Investment Holding Co., Ltd. has received funds from the Agence Fran?aise de Développement (the French Development Agency - AFD) towards the cost of Compound Ecological Project in Hedong New Area, Anzhou District, Mianyang City Financed by AFD. It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for AZ-G1: Procurement of equipment, supply and installation for the construction of a new water plant & intelligent water management information system engineering.
2、Bidding Content
Bidding No:0703-2550CIC2S012
Project Name:Procurement of equipment, supply and installation for the construction of a new water plant & intelligent water management information system engineering Financed by AFD
Place of Implementation:SICHUAN,CHINA
List of Products:
NO. Product Name Quantity Main Technical DataRemarks
1 Compound Ecological Project in Hedong New Area, Anzhou District, Mianyang City Financed by AFD AZ-G1: Procurement of equipment, supply and installation for the construction of a new water plant & intelligent water management information system engineering 1 refer to the Technical Part of the Bidding Documents (the second volume)

3、Qualification Requirements For Bidder
Qualifications or Performance:8.Qualification criteria are as follows:
(1) Eligibility Bidders must be independent legal entities registered in accordance with the law. Qualified corporate business license must be provided in the bidding documents, and overseas companies must provide corresponding enterprise registration documents. The bidders shall register on °Chinabidding Platform(www.qgbr.cn) before the bidding deadline specified in the bidding documents (the bidding registration table stamped with the official seal of the supplier shall be provided); the foreign bidder who has no seal shall submit the bidding registration table signed by the person in charge of the company). Otherwise, the bidder will not be allowed to participate in the bidding process, and the consequences arising therefrom shall be borne by the bidder .
(2) Financial Capabilities A.The Bidder shall demonstrate that it has access to, or has available, liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the construction cash flow requirements estimated as RMB ¥ 12 million for the subject contract(s) net of the Bidders other commitments
B.The Bidders shall also demonstrate, to the satisfaction of the Employer, that it has adequate sources of finance to meet the cash flow requirements on works currently in progress and for future contract commitments.
C.The audited balance sheets or, if not required by the laws of the Bidder's country, other financial statements acceptable to the Employer, for the last THREE(3) years shall be submitted and must demonstrate the current soundness of the Bidder's financial position and indicate its prospective long-term profitability.
Note: The audited financial statements of the last 3 years (2021 – 2022 – 2023) shall be submitted, if foreign bidder audit period is later than domestic time, it shall provide audited financial statements for year of 2022, 2021, and 2020 as proof. The source of the exchange rate shall be the first Bank Selling Rate announced by Bank of China on the date that of 28 days before the submission deadline for bidding.
ForJV bidder, each member of the JV shall also at least meet the minimum financial proportion requirements, For JV member, at least 25% of this requirement must be met For JV leader, at least 60% of this requirement must be met.
(3) Average Annual Supplier Turnover Minimum average annual turnover of RMB ¥ 72 million calculated as total certified payments received for contracts in progress and/or completed within the last 3 years (from 1st January, 2022 to Date of Bid submission), divided by 3 years.
Note: ForJV bidder, each member of the JV shall also at least meet the minimum financial proportion requirements, For JV member, at least 25% of this requirement must be met For JV leader, at least 60% of this requirement must be met..
(4) Experience 1)Last 5 years (from 1st January, 2020 to Date of Bid submission), the bidders have substantively completed at least THREE(3) similar project contract performances in China which is equipment supply (installation included) contracts in municipal public sector.
2)Among the above contract performances, the bidders, as the general contractor, shall have at least ONE(1) substantively completed similar project contract performances in China with a amount of not less than EUR 7.5 million (or equivalent foreign currency amount).
3)Last 5 years (from 1st January, 2020 to Date of Bid submission), the bidders have substantively completed at least ONE (1) similar project contract performance of EUR 5 million (or equivalent foreign currency amount) on a loan from a foreign government or an international financial organization in equipment supply (installation included) contracts in municipal public sector.
4)Last 5 years (from 1st January, 2020 to Date of Bid submission), the bidders or manufacturer shall have completed at least ONE(1) similar experience contract performance of EUR 1 million (or equivalent foreign currency amount) on the digital and intelligent information platform in water sector which has passed the preliminary acceptance and been put into operation.Software Development Items must includes:
①Digital operation management system for a water treatment plant with a daily capacity of 40,000 tons or more.
②Inspection and maintenance management system.
Note: Similar Experience is defined as the equipment supply (installation included) contract in municipal sector, The experience proof materials must be provided, the copy of the letter of acceptance, the copy of the contract and the copy of the acceptance certificate and the copy of photos of the completed project and the contact information of the project unit (the original is for reference), time shall be subject to the acceptance date of the acceptance certificate.

(5) Manufacturer authorization letter Written authorization letter issued by the manufacturer/ supplier for the following key equipment:
1.Air-flotation system
1)Integrated authorization of the coagulation reaction tank and the air flotation tank equipment for Air-flotation system (List of Goods-Item Code 2.3);
2)Integrated authorization for electrical and automatic control instrument equipment for Air-flotation system(List of Goods-Item Code 4.3 and 5.4).
2.Mixer
1)Rapid mixer for coagulation tank (List of Goods-Item Code 2.3.2);
2)Slow-speed mixer for flocculation tank(List of Goods-Item Code 2.3.3);
3)Submersible mixer and Submersible mixer(List of Goods-Item Code 2.8.2 and 2.10.1);
4)Reservoir homogenizing mixer(List of Goods-Item Code 2.12.13);
5)Solution mixer(List of Goods-Item Code 2.12.14).
3.Centrifugal Dehydrator
1)Centrifugal Dehydrator(List of Goods-Item Code 2.11.1)
4.Air Compressor
1)Air Compressor(List of Goods-Item Code 2.11.1);
2)Screw air compressor (with refrigerant dryer)(List of Goods-Item Code 2.11.1).
(6) Joint Venture Joint Venture is allowed in this bidding process.
In the case of JV, the following requirements shall be met:
1)JV shall have a JV agreement, clarifying the rights and obligations of the JV leader and each member;
2)Including the leader, the numbers of JV shall not exceed TWO(2);
3)Each member shall not participate in the same contract lot in its own name or participate in other JV;
4)JV leader shall be the party who have similar contract performance in equipment supply (installation included) contracts in municipal public sector, and shall be responsible for the bid registration, payment of bid security, submission of bid documents, contract signing and other related matters of the project.
(7) Equipment Technical Performance Air-flotation system
The Air-flotation supplier provide the water quality standard commitment whose water turbidity is lower than 3 NTU, and with the official seal;
Joint Bids:Available
Bid without the bidding documents:NOT Available
4、Acquisition of Bidding Documents
Beginning of Selling Bidding Documents:2025-05-05
Ending of Selling Bidding Documents:2025-05-12
Sell bidding?doc?online?or?not:No
To Obtain::On-site Purchase
Place:Building C, General Times Center, No. 1, Xiying Street, Fengtai District, Beijing
Price of Bidding Documents:¥2000/$274
Additional Instructions:3.The IFB is pubished on the following website at the same time:
°Chinabidding Platform (www.qgbr.cn)
°China Tendering and Bidding Public Service Platform (www.cebpubservice.cn)
°DG Market (tenders-afd.dgmarket.com).
Interested eligible bidders may obtain further information from and inspect the bidding documents at the office of The Instrimpex International Tendering Co., Ltd. The bidding documents shall be obtained within 5 working days from the date of announcement , that is, from 9:00 on May 6, 2025 to 17:00 on May 12, 2025
°Sell bidding doc online or not: No
°To Obtain: On-site or Post Purchase
(1)On-site: The authorized representative shall obtain the bidding documents at the following address before the deadline for obtaining the bidding documents, with the Application Form for purchasing attached and all the materials listed in the form. The purchase application will not be accepted after the deadline.
°Place:8/F, Building C, General Times Center, No. 1, Xiying Street, Fengtai District, Beijing
°Contact:Mr./Ms. Zhang
°Tel :010-81168424/9003
(2)Post: The Application Form for purchasing attached and all the materials listed in the form shall be delivered to the following address before the deadline for obtaining the bidding documents. The purchase application will not be accepted after the deadline.
°Place:8/F, Building C, General Times Center, No. 1, Xiying Street, Fengtai District, Beijing
°Contact:Mr./Ms. Zhang
°Tel :010-81168424/9003
A complete set of bidding documents may be purchased by interested bidders on the submission of a written application to the above and upon payment of a non-refundable fee of RMB 2,000.
°Account name: The Instrimpex International Tendering Co., Ltd.
°Bank: Bank of China Limited, Beijing Xicheng Sub-branch
°Account number: 318157689740
°Note: 0703-2550CIC2S012
5、Bid Submission
Deadline for Submitting Bids/Time of Bid Opening (Beijing Time):2026-07-02 09:30
Place of Bid:Meeting Room of 4th floor, Building A, Shouke Plaza, No.14, South Road of Xisanhuan, Fengtai District, Beijing
Place of Bid Opening:Meeting Room of 4th floor, Building A, Shouke Plaza, No.14, South Road of Xisanhuan, Fengtai District, Beijing
6、Contact Details
Purchasers:Mianyang City Anzhou Investment Holding Co., Ltd
Add.:No. 16 Building, Haikehua Garden, Huahai Town, Anzhou District, Mianyang City, Sichuan Province
Contact:Mrs.Zhong
Tel:0816-4333660
Bidding Agency:Instrimpex International Tendering Co.,Ltd.
Add.:Building C, General Times Center, No. 1, Xiying Street, Fengtai District, Beijing
Contact:Mr./Ms. Zhang
Tel:010-81168424/9003
7、Remittance Approach:
Bank(RMB):
Bank(USD):
Account NO.(RMB):
Account NO.(USD):
8、Additional Instruction
Attachments:00 G01招標公告.docx

主站蜘蛛池模板: 安西县| 泸溪县| 上林县| 贺州市| 西乌珠穆沁旗| 高碑店市| 刚察县| 凤城市| 扎兰屯市| 青河县| 响水县| 万荣县| 九龙坡区| 繁昌县| 鹤岗市| 杭锦后旗| 山西省| 白银市| 易门县| 天长市| 三台县| 河间市| 铜山县| 邻水| 吉木乃县| 仙游县| 巴塘县| 承德县| 密云县| 安庆市| 平定县| 略阳县| 布拖县| 长春市| 新平| 上饶市| 永德县| 应用必备| 连平县| 麦盖提县| 达日县|